To account for local challenges, standard rates were subject to percentage increases: Corporation Areas: +5% [3]. Tribal or Hilly/Inaccessible Areas: +10% [3, 6]. Sugarcane Factory Radius (10km): +5% [3].
The DSR was a versatile tool with three primary functions.
Adjustments were made to account for the difficulty of transporting materials and labor availability.
Rates per cubic meter, accounting for natural vs. crushed options.
The 2015-16 DSR was widely used across Maharashtra for several reasons: Pwd Dsr 2015-16 Maharashtra
| Section | Contents | |---------|----------| | | General rules, measurement guidelines, lead/lift policy, water charges, T&P (tools & plants). | | Part 2 | District-wise Basic Rates: Cement, steel, bricks, aggregates, sand, etc. | | Part 3 | Item rates (Earthwork – Excavation, filling) | | Part 4 | Concrete (Plain/RCC), formwork, reinforcement | | Part 5 | Masonry (Stone, Brick), Plaster, Pointing | | Part 6 | Flooring, Roofing, Woodwork, Painting | | Part 7 | Sanitary, Water supply, Drainage | | Part 8 | Road work (WBM, Bitumen, Seal coat, Tack coat) | | Part 9 | Bridge work, Steel fabrication | | Appendices | Conversion tables, escalation formulae, standard notes |
Serves as the baseline price against which contractors submit their competitive bids (e.g., "percentage above" or "percentage below" DSR).
Detailed costs for structural steel used in roof trusses, beams, and columns. Understanding Regional Factors and Premium Rates
The Detailed Standard Specifications (DSR) is a comprehensive document that provides guidelines for construction works, ensuring uniformity and quality in government-funded projects. It covers various aspects, including: To account for local challenges, standard rates were
This section forms the core of urban development estimates, detailing precise costs per unit for structural and architectural components:
Historically, the DSR was published as a physical booklet. However, it is also available through digital platforms.
Approximately ₹47,250 to ₹47,400 per M.T.. 2. Labor and Machinery Hire Charges
It is important to note that these rates were generally considered . The analysis for bitumen works included specifics on excise duty and cess, with provisions for adjustments if these rates changed. The DSR was a versatile tool with three primary functions
The represents a critical data set for understanding the cost structure of infrastructure development in Maharashtra during that period. It provided the necessary framework for maintaining quality standards while ensuring financial discipline in public works.
Obtain certified copy from PWD Executive Engineer’s office under RTI.
If you require this specific archive for legal or analytical purposes:
If you are looking for specific rates from this document, I can try to help you find the corresponding page if you specify the item and district. Maharashtra PWD DSR Rates 2015-16 | PDF - Scribd